Ferrovia Firenze Borgo S. Lorenzo
Bivio S. Marco Vecchio-Galleria del Calderaio 

After leaving Firenze Campo Carte and Bivio Cure the two track coming from Firenze Campo Marte and Firenze Santa Maria Novella join together at the Bivio (= junction) S. Marco Vecchio .
In a first time only the line from Firenze Campo Marte have been relaid (in the first days of February 1998) while the other leg from Firenze SMN will have been rebuilt eventually, in 2000.
Since most of these pages was written at the time of reopening of the line, without the latest additions, these are on this new page:
  • PM cionfo in 2000

  • This is the S. Marco junction seen toward south, a train stop with platform have been built here (The picture have been taken from the platform in december 1997). This stop was not present in the original line, as the ones at Pian del Mugnone and Cercina, and the new stop of Cure.
    On the map, is at the bottom of orange line.
    On left you see the line to Campo Marte, the concrete pillars on right were the place where the removed trestle was laid during the bridge rebuilding (you can see the bridge on left )

    Below images WITH the tracks, taken on 29/4/1998. On the image on the right you can observe a svitch on the track: This one was put there since the line has a slight but constant down gradient, to derail some escaping cars.
    On regular service have been removed.


     
     

    And now [January 1999] the line in full (same point of view of above pictures):

    This is same place looking north, on back the hill of Fiesole seen from north: on the left the line to Campo Marte, the one under restoration, on the right the line to SMN.
    Going north the line for about 800 m is graded for double track, althought presently only one have been posed.( the map is here, every square is 1 km )



    In this brief section there are 3 grade crossings, with extremely low traffic roads, on the picture at left you see a thing that resemple a stream, but it is a pedestrian underpass to  to connect the two side of a park that has split in two by the railway.
    In the picture below at right you can see the supports for noise insulation panels that are put routinely on new lines, when the track is near to houses
    IF YOU CLICK HERE YOU CAN WATCH ONE OF THE FIRST TRAIN ON THAT SECTION
    IF YOU INSTEAD CLICK HERE YOU CAN TRAVEL ON THIS SECTION ON THE FIRST PUBLIC  TRIP
     

    After it the line return again single track, cross under a stone arch of a private road nd there you can find the new stop with the denomination "Salviati". (picture on right, from the train)
    and approach the former grade crossing of via Salviati, that you can see in the rightmost picture below.


     
     

    This is a steep road that link the Bolognese with the Faentina. The original crossing at level was (and still is, the rail are still on the pavement) half the way, and would have let to serious problems, since it is a narrow road with fairly high traffic. Then the new line have been build passing below the road.
    The odd thing is that this time, since raising the road, althought from a transport point of view fine, would have had been unbearable from an environmental point of view : imagine a viaduct croissing the valley from left of the yellow buiding to the left , with an elicoidal exit in half.
    So the choose have been to move the railway in a tunnel even at the cost to let it do a double S curve.
    You see new trace behind the cypresses (where the tunnel begin) and at bottom left where it exits.
    This new section is green on the map.

    And this is the final effect ...
    Here on left we can see the old ROW and the arch the we see in the previous picture. The tunnel actually is more an underpass of the road since it has a small gradient on both sides toward center.
    On small picture on right you see the line on the hill, bevore entering the tunnel of Calderaio.

    I feel obligated to waste some bandwidth and storage spages for two images of the "gone" :-) grade crossing.
    The first one on the left is the old gate, with a "private road" sign posted by someone when still were no hope to have the line reopened, the second on the right is very recent and show the rails still remaining on the road paving.
    I have no information if these are the only remaining rails of the original line or they have been laid during a road repaving in prevision of the line reopening. In 1998 anyway were still there ....

    To end this sub-page an "historical" image It is a sign of preparatory works, when still the current FS spa had the name AAFS ...

    Push here to get next sections:

    Calderaio-Caldine

    Caldine-Basciano

    Basciano-Montorsoli

    Montorsoli-Cercina

    For information on the section North of Pratolino (valle del Carza) click here.


    If you will come here I will be happy to arrange a trip together


    You can reach me by e-mail at: leo@freedom.dicea.unifi.it